Imperial Navy Watercrafts
The LCP is almost finished by all accounts but the best part is comimg up, the details!
The ramp is finished, I was going to make the ramp control out of a chain but decide for cable instead. The ramp is attached and held in the half way position. I wanted to make it operable but the hull has been sealed and I did not want to cut out a panel and place the operating gears inside. Here are the final photos for this sequence and see you all around next posting with more goodies.
The crew, Life preservers, Ropes and things and other such sundries.
|