Thread: 1/87 pta mt-lb
View Single Post
 
Old 05-17-2011, 10:48 AM
Texman's Avatar
Texman Texman is offline
ADMINISTRATOR
 
Join Date: Jul 2007
Posts: 7,450
Total Downloaded: 1.79 GB
So, now I have started some track work. I have one length of tracks
with the basic work done, and am working on the second run of links now.
Here is what it looks like now.



It is not a fast process, as there are a total of 256 pieces to remove,
and 64 to add before I even begin the shading/rusting/weathering of the tracks.

I am waiting until the second length of track is ready before I do the weathering work, so they will match in appearance.
__________________
Ray

Respect the Paper, RESPECT IT!
GET OFF MY LAWN!
Reply With Quote