So, now I have started some track work. I have one length of tracks
with the basic work done, and am working on the second run of links now.
Here is what it looks like now.
It is not a fast process, as there are a total of 256 pieces to remove,
and 64 to add before I even begin the shading/rusting/weathering of the tracks.
I am waiting until the second length of track is ready before I do the weathering work, so they will match in appearance.