I started the aft mast structure for Oklahoma. I did not concern myself too much with measuring the pieces ahead of time as the model is so well designed. The mast is perfectly aligned with the formast, total time spent was about 4.5 hrs from getting the model out to the pictures. Maybe another week before I can do some more but am looking foward to getting the flying aft bridge installed. Once done with this I will Bring Arizona up to the same level.
The white upper works are difficult to capture with the camera and outside pics are out of the question due to the weather.