Thread
:
1/700 HMS Belfast
View Single Post
09-16-2016, 06:59 AM
Draco
Member
Join Date: Jan 2013
Posts: 1,642
Total Downloaded: 158.97 MB
And the armored cover of the torpedo tubes deck was placed, more of the superstructure is build and painted.
Very soon the hull will be finished and the detailed work will begin: cranes, boxes, anchors, etc, etc
Attached Thumbnails
__________________
https://ecardmodels.com/vendors/draco
Draco
View Public Profile
Send a private message to Draco
Find all posts by Draco