View Single Post
 
Old 09-16-2016, 06:59 AM
Draco's Avatar
Draco Draco is offline
Member
 
Join Date: Jan 2013
Posts: 1,642
Total Downloaded: 158.97 MB
And the armored cover of the torpedo tubes deck was placed, more of the superstructure is build and painted.

Very soon the hull will be finished and the detailed work will begin: cranes, boxes, anchors, etc, etc
Attached Thumbnails
1/700 HMS Belfast-cimg3189.jpg   1/700 HMS Belfast-cimg3195.jpg  
Reply With Quote