I really try to put up a long time builder. It feels like some sort of survival reported.
B2 figured a huge landing gear parts.
A portion of the landing gear bay.
Some parts are assembled state.
The rib parts.
Rib part was assembled.
Landing gear is the default frame.
Create a skeleton frame. The paper differs from the top hat When I started the assembly. So I assembled by cutting.
Repair using a separate sheet of paper.
The view from the other side.
Create a cylinder.
Finished the truss structure.
The lower part of the cylinder is being assembled.
Towing hook part. Brass wire part will be equipped with wheels.