View Single Post
 
Old 07-25-2017, 03:07 AM
Dan Vadas Dan Vadas is offline
Member
 
Join Date: Feb 2013
Location: Abermain NSW Australia
Posts: 57
Total Downloaded: 3.93 MB
Some more work done. The Funnel Bases and Pipework for the funnels. I've also fitted the 1.6mm x 0.2mm Step Irons to the funnels. The irons still need a bit of straightening and painting.

Cheers, Danny
Attached Thumbnails
IJN Amatsukaze 1940, 1:200 Halinski-funnel-bases-2-.jpg   IJN Amatsukaze 1940, 1:200 Halinski-pipes-6-.jpg   IJN Amatsukaze 1940, 1:200 Halinski-cowls-1-.jpg   IJN Amatsukaze 1940, 1:200 Halinski-step-iron-jig-7-.jpg  
Reply With Quote