The first wall is finished. The modified strip worked. The photos show the steps taken to make the finished product. I use the stone floor of the Archway Interior to make the entry way floor. In this assembly, I glued the floor strip to the top of the bottom tab of the wall. I think the assembly might be easier, if the stone floor strip is glued to the bottom of the archway first (completing the archway and making a more rigid sub-assembly for gluing to the edges of the archway opening in the wall). I glued the upper story lattice work to the wall before gluing the door assembly.
|