View Single Post
 
Old 09-10-2017, 04:47 PM
missileer missileer is offline
Member
 
Join Date: Jun 2013
Location: Annapolis, MD
Posts: 1,159
Total Downloaded: 969.48 MB
The first wall is finished. The modified strip worked. The photos show the steps taken to make the finished product. I use the stone floor of the Archway Interior to make the entry way floor. In this assembly, I glued the floor strip to the top of the bottom tab of the wall. I think the assembly might be easier, if the stone floor strip is glued to the bottom of the archway first (completing the archway and making a more rigid sub-assembly for gluing to the edges of the archway opening in the wall). I glued the upper story lattice work to the wall before gluing the door assembly.
Attached Thumbnails
White hart inn revisited-20170910_135721.jpg   White hart inn revisited-20170910_165105.jpg   White hart inn revisited-20170910_175503.jpg  
Reply With Quote