View Single Post
 
Old 01-24-2018, 12:45 PM
drg drg is offline
Member
 
Join Date: Nov 2012
Posts: 291
Total Downloaded: 0
Quote:
Originally Posted by wireandpaper View Post
Very nice model, how long did it take to be completed.
I guess you spend something like 40% building it and 60% detailing it.
Is this correct.
Thank you for sharing!
Thanks. I guess at a very rough estimate it took about 175 hours in total.

Not sure about building vs detailing? I just built everything as per instructions, pretty much, then did the rigging. Rigging took probably 10 hours or so.
Reply With Quote