View Single Post
 
Old 03-03-2018, 11:23 PM
missileer missileer is offline
Member
 
Join Date: Jun 2013
Location: Annapolis, MD
Posts: 1,159
Total Downloaded: 969.48 MB
I got one last thing accomplished today; I finished the front wall of the connector building. I added the angled shot to better show some of the layered overlays. For instance, the archway has a double thickness overlay with additional overlays on the top and the two side bands.
Attached Thumbnails
White hart inn revisited-20180303_235357.jpg   White hart inn revisited-20180303_235459.jpg  
Reply With Quote