Hi All,

Another step forward. All segments formed to fit the frames, but after dry fitting I found quite bad gap between last segments laid. After some investigation I found that 2nd & 3rd segment from bow is too short slightly and both combined makes this 3mm gap.

The first thought was to print scanned parts with scaling up. But there is no chance to match the color them. So decided to lay all the segments and fill the gap with strip, and paint red as much close as possible. I might be even able to hide it when it sits on the stand. Will see.

Also started some structure assembly. Without any troubles this time. So far I have added some extra formers and wall support strips made of 1mm cardboard. Much easier to avoid any damage while operating.
Attached Thumbnails
ORP Blyskawica - MM 5-6/81-img_3592.jpg   ORP Blyskawica - MM 5-6/81-img_3593.jpg   ORP Blyskawica - MM 5-6/81-img_3594.jpg   ORP Blyskawica - MM 5-6/81-img_3595.jpg   ORP Blyskawica - MM 5-6/81-img_3588.jpg  

ORP Blyskawica - MM 5-6/81-img_3589.jpg   ORP Blyskawica - MM 5-6/81-img_3590.jpg   ORP Blyskawica - MM 5-6/81-img_3591.jpg  
Reply With Quote