View Single Post
 
Old 01-18-2019, 02:10 PM
alzictorini's Avatar
alzictorini alzictorini is offline
Member
 
Join Date: May 2010
Location: Woodhall Spa, Lincolnshire
Posts: 409
Total Downloaded: 10.53 MB
Assembly

Hello PMs

Well its dry so ive had a chance to install the gauges on the dry panel.

This is the lower panel with all its bits:



And now with the upper panel attached:



Right side



Left side



Top view



It only needs the arming handles, fuel shut off and another lever which im not sure what it does.

Oh yes, the compass - its going to be in the way for the framing so Vermin King, ill make it as a seperate item.

Enjoy
Attached Thumbnails
Macchi C.202 Instrument Panel-2019-01-18-17.29.37.jpg   Macchi C.202 Instrument Panel-20190118_172542.jpg   Macchi C.202 Instrument Panel-2019-01-18-17.30.17.jpg  
__________________
Al Z
BF109 Panel
Macchi C202
Tertius Primus Erit
Reply With Quote