View Single Post
 
Old 02-08-2019, 03:54 PM
Styrian Spitfire's Avatar
Styrian Spitfire Styrian Spitfire is offline
Member
 
Join Date: Feb 2014
Location: Styria
Posts: 2,130
Total Downloaded: 0
Hi Kevin ,

yes I enjoying this , but only one

But now at the end of the construction report ...

Now the two pointed roofs, where the lower parts are glued individually ... so now all parts of the bow are installed

A worn-out brush is sawn ... dyed and placed in front of the driveway

Finally, the tower flags

Thus, after 12 days of craftsmanship and 26 hours of construction, the water gate of Sneek is ready.

A partially difficult to build model with many shortcomings, but the beautiful graphics outweigh the end result.

Despite various problems, I enjoyed building the model

Thank you to all the fellow for support and kind regards

Kurt
Attached Thumbnails
Water Gate Sneek -  Netherlands - Leon Schuijt-dscf0040.jpg   Water Gate Sneek -  Netherlands - Leon Schuijt-dscf0041.jpg   Water Gate Sneek -  Netherlands - Leon Schuijt-dscf0037-1-.jpg   Water Gate Sneek -  Netherlands - Leon Schuijt-dscf0038-1-.jpg   Water Gate Sneek -  Netherlands - Leon Schuijt-dscf0039-1-.jpg  

Water Gate Sneek -  Netherlands - Leon Schuijt-dscf0040-1-.jpg  
Reply With Quote