View Single Post
 
Old 04-03-2019, 08:45 AM
alzictorini's Avatar
alzictorini alzictorini is offline
Member
 
Join Date: May 2010
Location: Woodhall Spa, Lincolnshire
Posts: 409
Total Downloaded: 10.53 MB
Finished!!

Hello Pm's

Well, its time to complete the model and present it ready for display!

I've had a good think about this over the weeks and a friend at work in Airbus Getafe suggested I mount the panel in a Shadow Box. On looking on the net a shadow box could set me back well over 300 euros (the panel has only cost about 50 euros to make)!!
With this in mind my friend Jorge pointed me in the direction of a guy who produced me a shadow box for 85 Euros. Genial.

When the box arrived I looked at how to present the panel in the box. My wife suggested the italian flag as a base and this is what I went for:



I fist mounted coloured paper onto the MDF back and cut it to shape:



Having worked out were the panel and the data plates where going to go, I started to mount them:





Its starting to take shape:



So far so good
Attached Thumbnails
Macchi C.202 Instrument Panel-aeronautica-macchi-c.202-1.jpg   Macchi C.202 Instrument Panel-aeronautica-macchi-c.202-4.jpg   Macchi C.202 Instrument Panel-aeronautica-macchi-c.202-5.jpg   Macchi C.202 Instrument Panel-aeronautica-macchi-c.202-6.jpg   Macchi C.202 Instrument Panel-aeronautica-macchi-c.202-7.jpg  

__________________
Al Z
BF109 Panel
Macchi C202
Tertius Primus Erit
Reply With Quote