View Single Post
 
Old 11-25-2019, 12:50 PM
hyair hyair is offline
Member
 
Join Date: Jan 2012
Location: Rehovot - Israel
Posts: 1,703
Total Downloaded: 52.76 MB
Lightning build diary continueA

Started to build the body in the section methud. Then inserting the shape disks
and connecting the whole fugelage.

Yair
Attached Thumbnails
English electric Lightning WHM 1:48-20191125_192258.jpg   English electric Lightning WHM 1:48-20191125_192310.jpg   English electric Lightning WHM 1:48-20191125_200410.jpg   English electric Lightning WHM 1:48-20191125_200414.jpg  
Reply With Quote