View Single Post
 
Old 12-05-2019, 05:48 AM
surfduke's Avatar
surfduke surfduke is offline
Member
 
Join Date: Jul 2007
Location: Tampa FL
Posts: 966
Total Downloaded: 968.01 MB
The controls on the freeze tube wall need to move below the first mountain fold. Also they should reside in a blocked out area there. I will correct this tonight. Sorry for the mistake. The Tube piping will be completed Friday night. It will reside in front of the center panel. There will be three of these walls in final publish. The yellow disks are to be built up to simulate the rounded wall sconces, and are to be glued on the yellow circle locations. This is a work in progress lol.

Carl
Reply With Quote