View Single Post
 
Old 12-23-2019, 08:09 AM
modelperry's Avatar
modelperry modelperry is offline
Member
 
Join Date: Feb 2008
Location: Burlington, Iowa
Posts: 2,826
Total Downloaded: 10.41 MB
Parts 2 through 4, the remaining parts of the rear blade assembly. All are in paint or through paint and waiting for final assembly.

Once I am on that stage, I will show the blade assembled and in transport position before placing it in its intended position for display.

Also, while there are multitudes of additional accessories provided, I will only build a few more before this part of the project is finished.

greg
Attached Thumbnails
Famo, trailer and stug III - long term project-img_20191220_200923.jpg   Famo, trailer and stug III - long term project-img_20191220_214427.jpg   Famo, trailer and stug III - long term project-img_20191222_152338.jpg   Famo, trailer and stug III - long term project-img_20191222_160851.jpg   Famo, trailer and stug III - long term project-img_20191222_172145.jpg  

Famo, trailer and stug III - long term project-img_20191222_172153.jpg  
__________________
In dry dock: ? In factory: CWS T-1. In hanger: Fokker triplanes? under construction: ?
Reply With Quote