The model is complete. I decided not to build the landing gear since it will be hung up later on. If you do decide to build it with the landing gear down, you will need some nose weight or else it will be a tail seater.
Here are some pics of the completed model.
It took me a few hours over 3 days, but it can be built in one day in about 6 hours if you wanted to.
Another one for my "hotel builds"
I am thinking of building the El-Al repainted version of the same kit. Available in our Download section:
http://www.papermodelers.com/forum/v...ownloadid=2106
A side note
I am super excited to return to my radio controlled airplane and drone flying. So this is one reason, my paper building is on the back burner for a while.
Isaac