View Single Post
 
Old 02-27-2020, 11:45 AM
Styrian Spitfire's Avatar
Styrian Spitfire Styrian Spitfire is offline
Member
 
Join Date: Feb 2014
Location: Styria
Posts: 2,109
Total Downloaded: 0


Continue with the roof of the rampart ... strengthen the roof and floor ...
... and close ... but now there is a gap of 2 mm between the two roofs ...

... which I level with cardboard ... with the three corner towers and a total of forty cantilever stones on the outside ...

... and the south wall is finished inside

With chivalrous greetings
Kurt
Attached Thumbnails
Castle Tyrov (Angerbach) Bohemia - 1: 200 - Dukase-dscf0009-2-.jpg   Castle Tyrov (Angerbach) Bohemia - 1: 200 - Dukase-dscf0010-2-.jpg   Castle Tyrov (Angerbach) Bohemia - 1: 200 - Dukase-dscf0011-2-.jpg   Castle Tyrov (Angerbach) Bohemia - 1: 200 - Dukase-dscf0012-2-.jpg   Castle Tyrov (Angerbach) Bohemia - 1: 200 - Dukase-dscf0013-2-.jpg  

Castle Tyrov (Angerbach) Bohemia - 1: 200 - Dukase-dscf0014.jpg   Castle Tyrov (Angerbach) Bohemia - 1: 200 - Dukase-dscf0015.jpg  
Reply With Quote