View Single Post
 
Old 04-19-2020, 02:04 AM
hyair hyair is offline
Member
 
Join Date: Jan 2012
Location: Rehovot - Israel
Posts: 1,703
Total Downloaded: 52.76 MB
F-86D Sabre dog 1:48 - Build diary

As before I build one step at the time - main issue here when putting the tail rudder is that we need to let the gluing area to dry before the horizontal stabilizers installation.
The skirts for the horizontal stabilizers were built.

Yair
Attached Thumbnails
F-86D Sabre dog Murph's models 1:48-20200419_105247.jpg   F-86D Sabre dog Murph's models 1:48-20200419_105300.jpg   F-86D Sabre dog Murph's models 1:48-20200419_105417.jpg   F-86D Sabre dog Murph's models 1:48-20200419_110212.jpg  
Reply With Quote