View Single Post
 
Old 11-21-2020, 12:01 AM
Styrian Spitfire's Avatar
Styrian Spitfire Styrian Spitfire is offline
Member
 
Join Date: Feb 2014
Location: Styria
Posts: 2,130
Total Downloaded: 0


Second construction phase - transverse ribs ... glued

The sloping longitudinal ribs ... are fitted dry and then glued, so far everything fits very well!

The frame structure is actually a model in itself and very stable

Sincerely
Kurt
Attached Thumbnails
Mine ship Queen Luise - G.K.Verlag - 1:250-dscf0013.jpg   Mine ship Queen Luise - G.K.Verlag - 1:250-dscf0003.jpg   Mine ship Queen Luise - G.K.Verlag - 1:250-dscf0004.jpg   Mine ship Queen Luise - G.K.Verlag - 1:250-dscf0005.jpg   Mine ship Queen Luise - G.K.Verlag - 1:250-dscf0007.jpg  

Reply With Quote