Making progress if slow.
I found a drawing error with the mid-ships crane. Part 95 and 95a. Basically 95a has the cross beam, not 95 as shown in the drawing. It could a bit of a slow while I tried to make sure I was putting things together correctly. Still not sure overall but it looks good. Also have the mast done. Have to get some pictures taken of it and the aft equipment boom.
__________________
Greg
|