View Single Post
 
Old 08-02-2021, 12:34 PM
modelperry's Avatar
modelperry modelperry is offline
Member
 
Join Date: Feb 2008
Location: Burlington, Iowa
Posts: 2,826
Total Downloaded: 10.41 MB
Rear outrigger box built and installed. I had to perform some surgery on the frame to get the box installed. There was 1 mm lamination that interfered with the correct fit up.

Also got some attachment points installed for axle/suspension components.

Last picture is me reliving one of my past duties when I worked for a crane manufacturer: finding the center of gravity (CG) of weldments....

Greg
Attached Thumbnails
Bumar-Labedy Crane - Modelik-20210801_144729.jpg   Bumar-Labedy Crane - Modelik-20210801_144736.jpg   Bumar-Labedy Crane - Modelik-20210801_145531.jpg   Bumar-Labedy Crane - Modelik-20210801_145747.jpg   Bumar-Labedy Crane - Modelik-20210801_145755.jpg  

Bumar-Labedy Crane - Modelik-20210801_185820.jpg   Bumar-Labedy Crane - Modelik-20210801_191604.jpg  
__________________
In dry dock: ? In factory: CWS T-1. In hanger: Fokker triplanes? under construction: ?
Reply With Quote