View Single Post
 
Old 06-11-2022, 07:59 AM
FRD's Avatar
FRD FRD is offline
Member
 
Join Date: Aug 2012
Location: Jacksonville Florida
Posts: 1,760
Total Downloaded: 0
Fore and Aft mast

So I got the Fore and Aft mast done, all that's left to do is a tremendous number of stairs, ladders and watertight doors to add.

This second phase is nearly complete, this will be the second time and way it will be drawn, the first was the wireframe.

The third time I draw it will be, "breaking it down" to all of it's 2-D components, totally different process.

The fourth time I draw it will be the various technical illustrations to aid in assembly.
Attached Thumbnails
DD 886 u.s.s. Orleck design process-orleck-temp0043.jpg   DD 886 u.s.s. Orleck design process-orleck-temp0044.jpg   DD 886 u.s.s. Orleck design process-orleck-temp0042.jpg   DD 886 u.s.s. Orleck design process-orleck-temp0041.jpg   DD 886 u.s.s. Orleck design process-orleck-temp0040.jpg  

DD 886 u.s.s. Orleck design process-orleck-temp0039.jpg   DD 886 u.s.s. Orleck design process-orleck-temp0038.jpg  
__________________
Replicating Excellence-> https://ecardmodels.com/vendors/replicating-excellence
Reply With Quote