PaperModelers.com

Go Back   PaperModelers.com > Card Models > Model Builds > Architectural Models

Reply
 
Thread Tools Display Modes
  #61  
Old 02-05-2020, 07:58 AM
rockpaperscissor's Avatar
rockpaperscissor rockpaperscissor is offline
Member
 
Join Date: Dec 2007
Location: The thriving metropolis of Wappingers Falls, NY, USA
Posts: 4,539
Total Downloaded: 127.35 MB
Excellent work. So much detail and so realistic. Wonderful!
__________________
Regards, Don
I don't always build models, but when I do... I prefer paper. Keep your scissors sharp, my friends.
Reply With Quote
  #62  
Old 02-05-2020, 12:38 PM
Styrian Spitfire's Avatar
Styrian Spitfire Styrian Spitfire is offline
Member
 
Join Date: Feb 2014
Location: Styria
Posts: 2,109
Total Downloaded: 0
Hello Don , thank you

Hello, just a little bit of construction today ...

Now prepare the roof ... and just put it on, it fits !!!

Sincerely
Kurt
Attached Thumbnails
Castle Tyrov (Angerbach) Bohemia - 1: 200 - Dukase-dscf0019.jpg   Castle Tyrov (Angerbach) Bohemia - 1: 200 - Dukase-dscf0020.jpg  
Reply With Quote
  #63  
Old 02-06-2020, 10:17 PM
Styrian Spitfire's Avatar
Styrian Spitfire Styrian Spitfire is offline
Member
 
Join Date: Feb 2014
Location: Styria
Posts: 2,109
Total Downloaded: 0

The little turrets are again very delicate ... with the individual parts being built separately ...

... and glued to the Maschikuli ... that was a hundred minutes for the three turrets

Sincerely
Kurt
Attached Thumbnails
Castle Tyrov (Angerbach) Bohemia - 1: 200 - Dukase-dscf0021.jpg   Castle Tyrov (Angerbach) Bohemia - 1: 200 - Dukase-dscf0022.jpg   Castle Tyrov (Angerbach) Bohemia - 1: 200 - Dukase-dscf0023.jpg   Castle Tyrov (Angerbach) Bohemia - 1: 200 - Dukase-dscf0024.jpg  
Reply With Quote
  #64  
Old 02-10-2020, 12:26 AM
Styrian Spitfire's Avatar
Styrian Spitfire Styrian Spitfire is offline
Member
 
Join Date: Feb 2014
Location: Styria
Posts: 2,109
Total Downloaded: 0
and further …

With a total of thirty-seven cantilever bricks on the outside ... and on the inside, section 7, the north wall, is finished

LG Kurt
Attached Thumbnails
Castle Tyrov (Angerbach) Bohemia - 1: 200 - Dukase-dscf0001.jpg   Castle Tyrov (Angerbach) Bohemia - 1: 200 - Dukase-dscf0002.jpg  
Reply With Quote
  #65  
Old 02-13-2020, 12:54 PM
Styrian Spitfire's Avatar
Styrian Spitfire Styrian Spitfire is offline
Member
 
Join Date: Feb 2014
Location: Styria
Posts: 2,109
Total Downloaded: 0


Parts 73 - 75 ... a small bridge ...

... as a link between the guard and the walkway

with knightly greetings

Kurt
Attached Thumbnails
Castle Tyrov (Angerbach) Bohemia - 1: 200 - Dukase-dscf0004.jpg   Castle Tyrov (Angerbach) Bohemia - 1: 200 - Dukase-dscf0005.jpg   Castle Tyrov (Angerbach) Bohemia - 1: 200 - Dukase-dscf0006-2-.jpg  
Reply With Quote
Google Adsense
  #66  
Old 02-19-2020, 10:47 PM
Styrian Spitfire's Avatar
Styrian Spitfire Styrian Spitfire is offline
Member
 
Join Date: Feb 2014
Location: Styria
Posts: 2,109
Total Downloaded: 0

Section 8 of the upper castle, the south wall ... with the associated parts

Let's start with the inner wall ... which is clamped to dry to avoid warping
The prepared shed is now also being grown in the courtyard

Sincerely yours
Kurt
Attached Thumbnails
Castle Tyrov (Angerbach) Bohemia - 1: 200 - Dukase-dscf0009.jpg   Castle Tyrov (Angerbach) Bohemia - 1: 200 - Dukase-dscf0010.jpg   Castle Tyrov (Angerbach) Bohemia - 1: 200 - Dukase-dscf0011.jpg   Castle Tyrov (Angerbach) Bohemia - 1: 200 - Dukase-dscf0012.jpg   Castle Tyrov (Angerbach) Bohemia - 1: 200 - Dukase-dscf0013.jpg  

Reply With Quote
  #67  
Old 02-23-2020, 01:03 AM
Styrian Spitfire's Avatar
Styrian Spitfire Styrian Spitfire is offline
Member
 
Join Date: Feb 2014
Location: Styria
Posts: 2,109
Total Downloaded: 0


The outer wall reinforced ... and placed

Prepare the rampart for the South Wall in the usual manner ... close with part 194 ...

... and put it on the wall

Sincerely
Kurt
Attached Thumbnails
Castle Tyrov (Angerbach) Bohemia - 1: 200 - Dukase-dscf0002-2-.jpg   Castle Tyrov (Angerbach) Bohemia - 1: 200 - Dukase-dscf0003.jpg   Castle Tyrov (Angerbach) Bohemia - 1: 200 - Dukase-dscf0007-2-.jpg   Castle Tyrov (Angerbach) Bohemia - 1: 200 - Dukase-dscf0001.jpg   Castle Tyrov (Angerbach) Bohemia - 1: 200 - Dukase-dscf0002.jpg  

Reply With Quote
  #68  
Old 02-27-2020, 11:45 AM
Styrian Spitfire's Avatar
Styrian Spitfire Styrian Spitfire is offline
Member
 
Join Date: Feb 2014
Location: Styria
Posts: 2,109
Total Downloaded: 0


Continue with the roof of the rampart ... strengthen the roof and floor ...
... and close ... but now there is a gap of 2 mm between the two roofs ...

... which I level with cardboard ... with the three corner towers and a total of forty cantilever stones on the outside ...

... and the south wall is finished inside

With chivalrous greetings
Kurt
Attached Thumbnails
Castle Tyrov (Angerbach) Bohemia - 1: 200 - Dukase-dscf0009-2-.jpg   Castle Tyrov (Angerbach) Bohemia - 1: 200 - Dukase-dscf0010-2-.jpg   Castle Tyrov (Angerbach) Bohemia - 1: 200 - Dukase-dscf0011-2-.jpg   Castle Tyrov (Angerbach) Bohemia - 1: 200 - Dukase-dscf0012-2-.jpg   Castle Tyrov (Angerbach) Bohemia - 1: 200 - Dukase-dscf0013-2-.jpg  

Castle Tyrov (Angerbach) Bohemia - 1: 200 - Dukase-dscf0014.jpg   Castle Tyrov (Angerbach) Bohemia - 1: 200 - Dukase-dscf0015.jpg  
Reply With Quote
  #69  
Old 03-01-2020, 12:32 AM
Styrian Spitfire's Avatar
Styrian Spitfire Styrian Spitfire is offline
Member
 
Join Date: Feb 2014
Location: Styria
Posts: 2,109
Total Downloaded: 0


This is followed by construction phase 9 - rampart with roof for the Donjon ... with approx. 140 parts which are installed here

Frame 19 is reinforced ... Prepare military corridor 17 ...

With chivalrous greetings
Kurt
Attached Thumbnails
Castle Tyrov (Angerbach) Bohemia - 1: 200 - Dukase-dscf0016.jpg   Castle Tyrov (Angerbach) Bohemia - 1: 200 - Dukase-dscf0017.jpg   Castle Tyrov (Angerbach) Bohemia - 1: 200 - Dukase-dscf0026.jpg   Castle Tyrov (Angerbach) Bohemia - 1: 200 - Dukase-dscf0027.jpg  
Reply With Quote
  #70  
Old 03-03-2020, 11:35 AM
Styrian Spitfire's Avatar
Styrian Spitfire Styrian Spitfire is offline
Member
 
Join Date: Feb 2014
Location: Styria
Posts: 2,109
Total Downloaded: 0


... reinforce ... after installing the cardboard frames, eight beams are glued in ...

... whereupon the covers are glued ... the four oriels are prepared for the corners ...

... and glued, by the way, a hundred hours of construction time has now been reached

Sincerely
Kurt
Attached Thumbnails
Castle Tyrov (Angerbach) Bohemia - 1: 200 - Dukase-dscf0028.jpg   Castle Tyrov (Angerbach) Bohemia - 1: 200 - Dukase-dscf0029.jpg   Castle Tyrov (Angerbach) Bohemia - 1: 200 - Dukase-dscf0030.jpg   Castle Tyrov (Angerbach) Bohemia - 1: 200 - Dukase-dscf0031.jpg   Castle Tyrov (Angerbach) Bohemia - 1: 200 - Dukase-dscf0032.jpg  

Reply With Quote
Google Adsense
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -6. The time now is 12:42 PM.


Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.

Parts of this site powered by vBulletin Mods & Addons from DragonByte Technologies Ltd. (Details)
Copyright © 2007-2023, PaperModelers.com