#21
|
||||
|
||||
good to see some upward progress kurt
__________________
David........... Paper modelling gives you a happy high. currently building. c GAZ 51 ALG 17, wagon 111a. unex DH411 excavator and spitfire Mk 9 |
#22
|
||||
|
||||
The roof for the keep consists of four parts ... which are first built together ... ... and then put the reinforced roof on top of the keep Sincerely Kurt |
#23
|
||||
|
||||
Elevator bay 34 and five tower bay windows ... where I remove the tabs and butt glue the tips The five bay windows attached to the tower looks great Part 40, a landscape wedge ... placed in the first courtyard Sincerely Kurt |
#24
|
||||
|
||||
Part 41 ... the small wall that will connect the keep with the mantle wall Now the huge south front consisting of parts 42 to 44 ... whereby it should be noted that the lower part is NOT reinforced, glue the battlements ... ... add the whole wall to the foundation of the third courtyard Sincerely Kurt |
#25
|
||||
|
||||
nice progress Kurt
__________________
David........... Paper modelling gives you a happy high. currently building. c GAZ 51 ALG 17, wagon 111a. unex DH411 excavator and spitfire Mk 9 |
Google Adsense |
#26
|
||||
|
||||
Thank you David
The fountain tower follows ... reinforcements glued in ... ... and built next to the south wall Sincerely Kurt |
#27
|
||||
|
||||
Kurt,
this is coming along great. Nice work as usual.
__________________
Mike Current builds: St Luke's Church |
#28
|
||||
|
||||
Thank you Mike
Now the cliffs 46/47 ... which are put together without coloring edges ... ... and used on the north side of the keep, the rocks will later be redesigned in 3D ... the overhanging rock follows ... ... which is glued again ... and fitted to the west side of the keep Sincerely Kurt |
#29
|
||||
|
||||
Continue with the filigree battlements tower ... which is placed on the overhanging rock The next little turret ... add a roof to the battlements tower Insert the connecting wall to the coat of arms tower ... at an angle Sincerely Kurt |
#30
|
||||
|
||||
Steep slope 59 ... insert under the connecting wall Rock parts 60/61 ... glued on the east side Parts 62/63 ... now close the rock wreath around the keep on the south side Sincerely Kurt |
Google Adsense |
|
|