#51
|
||||
|
||||
Thanks to gotham and Dan
Two bridges and a rock ... strengthening the bridge, removing the tabs ... ... and installed between the battlements and the women's tower ... Parts 117/118, the access to the stone ... attach with the open side facing outwards With best regards Kurt |
#52
|
||||
|
||||
The next defensive wall with battlements and battlements ... is not easy to build, but with reinforcements I made it ... ... now connect the whole thing to the chapel ... and immediately prepare the rocks in the inner courtyard Sincerely Kurt |
#53
|
||||
|
||||
Ascent built, rocks colored ... two small bay windows ... ... placed on the wall ... ... view from the kestrel's nest into the 3rd courtyard Sincerely Kurt |
#54
|
||||
|
||||
looking good Kert
__________________
David........... Paper modelling gives you a happy high. currently building. c GAZ 51 ALG 17, wagon 111a. unex DH411 excavator and spitfire Mk 9 |
#55
|
||||
|
||||
Amazing. Always quality work, sir
__________________
A fine is a tax when you do wrong. A tax is a fine when you do well. |
Google Adsense |
#56
|
||||
|
||||
I repeat my previous post, I am loving this build.
__________________
"It's all in the reflexes." |
#57
|
||||
|
||||
Thanks to all guys !!
|
#58
|
||||
|
||||
Continue with the Dürnitzturm ... which is only reinforced in the upper part ... ... and attached to the base. The roof, staircase and bay window ... placed Sincerely Kurt |
#59
|
||||
|
||||
Two roof bay windows are added to the outside Now it's going to be culinary, the kitchen tower ... leaning against the Dürnitzturm ... ... three extra small roofs ... for the roof bay windows Sincerely Kurt |
#60
|
||||
|
||||
Part 137, the weir, a complex part ... which I first assemble with reinforcements and use the roof to stabilize it, now let it dry well Some roofs and bay windows ... will be put on after the weir has been added ... ... so the third courtyard is closed Sincerely Kurt |
Google Adsense |
|
|