#351
|
||||
|
||||
Take your time Igor,there is a lot of tedious work there.
|
#352
|
||||
|
||||
So, it was a busy period last month, so time for modeling was reduced.
Nevertheless i continued to build in small portions. As i mentioned before, i moved on to bogies. The designer went nuts here and designed them with almost every detail as in real thing. A lot of work done, a little to show Started from suspension wheel arms Conveyor method is very useful here. First of all is cutting all the parts Then start to assemble every detail repeatedly. So here is the unfinished process by far Stay tuned for more
__________________
Welcome to my gallery Last edited by Igor; 11-13-2020 at 07:56 AM. |
#353
|
||||
|
||||
looking good Igor
__________________
David........... Paper modelling gives you a happy high. currently building. c GAZ 51 ALG 17, wagon 111a. unex DH411 excavator and spitfire Mk 9 |
#354
|
||||
|
||||
Great work, I'd be banging my head against a wall doing all that repetitive work.
__________________
"It's all in the reflexes." |
#355
|
|||
|
|||
Igor, that's awesome!!!
|
Google Adsense |
#356
|
||||
|
||||
Thanks David, Gotham and Boris
I continued with wheel arms. This are rubbing plates on which suspension levers seat and move. And last are connecting hubs. They join two arms together and eventually we got 12 pairs of wheel arms one for each wheel. Arms finished and i want just to mention that you need to pay attention for left and right side. Each part is given as one number but there is a difference between left and right along all the assembling.
__________________
Welcome to my gallery |
#357
|
|||
|
|||
That's very precise work!
|
#358
|
||||
|
||||
They are marvelous, are your eyes square yet?
|
#359
|
||||
|
||||
Coming together.
The bogies are magnificent - well worth the effort Igor!
__________________
The SD40 is 55 now! |
#360
|
||||
|
||||
Brilliant work
__________________
"It's all in the reflexes." |