PaperModelers.com

Go Back   PaperModelers.com > Card Models > Model Builds > PASA, Paper Aeronautical and Space Administration

Reply
 
Thread Tools Display Modes
  #1381  
Old 06-28-2017, 06:02 PM
gene1772 gene1772 is offline
Member
 
Join Date: Aug 2009
Posts: 135
Total Downloaded: 319.31 MB
Space runner, your attention to detail and your skill are amazing but both are exceeded by you patience!!! As always outstanding work.
Reply With Quote
  #1382  
Old 06-29-2017, 01:55 AM
spacerunner's Avatar
spacerunner spacerunner is offline
Member
 
Join Date: Apr 2012
Location: Filderstadt, Germany
Posts: 2,197
Total Downloaded: 5.57 MB
Thanks Gene for your kind words.

For being able to successfully scratch such details, one needs both.

Only skill is not enough, if one doesn't have enough patience and perseverance, because many things do not work immediately, even not with me.

Then one has to keep on fiddling until one has got a smart idea for a suitable solution ...

But to whom do I say that, you have impressively demonstrated these features with your fantastic Crawler.

__________________
Greetings from Germany
Manfred
Under construction:
Launch Pad 39A with Challenger STS-6 (1:144)
Reply With Quote
  #1383  
Old 06-30-2017, 02:11 AM
spacerunner's Avatar
spacerunner spacerunner is offline
Member
 
Join Date: Apr 2012
Location: Filderstadt, Germany
Posts: 2,197
Total Downloaded: 5.57 MB
Hello everybody,

before it goes on in the Bay 17 with the upper console with the two connector sockets,


Source: Library of Congress

I've been busy myself with the gutters and initially corrected their lengths based on the the MLP-3 photo,


Source: Library of Congress

which differ a little bit from the values previously determined at the MLP-1.

With the Gutter-3 (Ø 10'') above the Bay 18 I had already started.



When dimensioning the strips for the gutter, one has to take into account that it does not have a semicircular cross-section as in ordinary guttering on the house, but rather that it extends somewhat beyond the semicircle, as can be seen in this image,


Source: NASA

which is why the strip should be slightly wider than half of the diameter, approximately 4 mm.

For molding the strip of 0.1 mm aluminum sheet over a core wire with Ø 1.5 mm this Rolling Set (thesmallshop.com) is suitable, in which the strip can be bulged in a first step.



In order to mold the gutter to the final diameter, I have also tried my Balsa clamping method from the SSWS Pipes.


For the first tests, I also used the wrapping foil of a champagne bottle cork.



And as it looks like, this method should also be suitable for the molding of the longer gutter parts.

At the same time, I have also tried to use a thin Styrene foil (0.15 mm) because plastic might be advantageous for gluing the supports under the gutters, which would make them more stable.



But since the plastic strip is less ductile than the aluminum strip, it is not easy to buckle it.



And even after the hot air shower in the Balsa-"Corset"







the result was not so amazing,



which is why I will probably stay with the aluminum sheet.

__________________
Greetings from Germany
Manfred
Under construction:
Launch Pad 39A with Challenger STS-6 (1:144)
Reply With Quote
  #1384  
Old 06-30-2017, 08:08 PM
beckychestney's Avatar
beckychestney beckychestney is offline
Member
 
Join Date: Jun 2016
Location: Suburbs of Cleveland Ohio
Posts: 739
Total Downloaded: 99.82 MB
Whew! Glad to see your photos are safe! I've lost my links from Photobucket!
Reply With Quote
  #1385  
Old 07-01-2017, 10:36 AM
VinceM's Avatar
VinceM VinceM is offline
Member
 
Join Date: Apr 2012
Location: Indiana, USA
Posts: 573
Total Downloaded: 145.94 MB
Quote:
Originally Posted by spacerunner View Post
For the first tests, I also used the wrapping foil of a champagne bottle cork.
Very dedicated to this project, to buy a bottle of champagne just to get a piece of foil!
Amazing work. Great job.
__________________
Recent builds: RMS Queen Mary 2, Paris Opera House
In the shipyard: USS Missouri, DKM Graf Zeppelin, RV Calypso.
Future builds: IJN Akagi, SS United States, HMVS Cerberus, and lots more!
Reply With Quote
  #1386  
Old 07-01-2017, 02:25 PM
spacerunner's Avatar
spacerunner spacerunner is offline
Member
 
Join Date: Apr 2012
Location: Filderstadt, Germany
Posts: 2,197
Total Downloaded: 5.57 MB
Thanks Vince for your nice words.
What must be, must be.

Cheers!

__________________
Greetings from Germany
Manfred
Under construction:
Launch Pad 39A with Challenger STS-6 (1:144)
Reply With Quote
  #1387  
Old 07-01-2017, 04:03 PM
casca casca is offline
Member
 
Join Date: Dec 2008
Location: Corpus Christi
Posts: 41
Total Downloaded: 354.7 KB
Are you familiar with the word "obsession" ?
Reply With Quote
  #1388  
Old 07-01-2017, 05:36 PM
spacerunner's Avatar
spacerunner spacerunner is offline
Member
 
Join Date: Apr 2012
Location: Filderstadt, Germany
Posts: 2,197
Total Downloaded: 5.57 MB
If I understand that as an allusion to my extraordinary attention to detail, then you possibly mean "obsession" in the sense of addiction, and therewith you might be a little bit right.
BTW, I also realize that I'm tending more and more to smaller details, what is like a drug, and in this sence you even might say that I'm a Detail Junkie, okay ...

__________________
Greetings from Germany
Manfred
Under construction:
Launch Pad 39A with Challenger STS-6 (1:144)
Reply With Quote
  #1389  
Old 07-02-2017, 12:37 AM
Tonino's Avatar
Tonino Tonino is offline
Member
 
Join Date: Nov 2014
Location: Republic of San Marino
Posts: 207
Total Downloaded: 40.04 MB
I'm totally with you Manfred!

Reply With Quote
  #1390  
Old 07-02-2017, 05:58 AM
spacerunner's Avatar
spacerunner spacerunner is offline
Member
 
Join Date: Apr 2012
Location: Filderstadt, Germany
Posts: 2,197
Total Downloaded: 5.57 MB
Hi Tonino,
the fact that we are both on a same wavelength concerning details, has become clear to me after I have followed your awesome project for a while.
That's why you're also a Detail Junkie like me.
That's okay!

__________________
Greetings from Germany
Manfred
Under construction:
Launch Pad 39A with Challenger STS-6 (1:144)
Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -6. The time now is 11:05 AM.


Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.

Parts of this site powered by vBulletin Mods & Addons from DragonByte Technologies Ltd. (Details)
Copyright © 2007-2023, PaperModelers.com