PaperModelers.com

Go Back   PaperModelers.com > Card Models > Model Builds > PASA, Paper Aeronautical and Space Administration

Reply
 
Thread Tools Display Modes
  #631  
Old 10-22-2014, 03:35 AM
highdobb's Avatar
highdobb highdobb is offline
Member
 
Join Date: May 2012
Location: San Francisco
Posts: 3
Total Downloaded: 0
Hats off to you sir! Sad I only just stumbled on the thread, but I've had my jaw open for a couple hrs catching up lol! Excited for more, inspired for more!
__________________
"He who can no longer pause to wonder and stand rapt in awe, is as good as dead; his eyes are closed." -Albert
Reply With Quote
  #632  
Old 10-22-2014, 07:40 AM
spacerunner's Avatar
spacerunner spacerunner is offline
Member
 
Join Date: Apr 2012
Location: Filderstadt, Germany
Posts: 2,197
Total Downloaded: 5.57 MB
Thanks highdopp for your nice response.
Then you were but curious. Stay tuned, it becomes even more exciting.

__________________
Greetings from Germany
Manfred
Under construction:
Launch Pad 39A with Challenger STS-6 (1:144)
Reply With Quote
  #633  
Old 10-22-2014, 10:29 AM
eagleclaw4935's Avatar
eagleclaw4935 eagleclaw4935 is offline
Member
 
Join Date: Oct 2009
Location: New bedford,MA
Posts: 762
Total Downloaded: 2.75 GB
If this isnt one of the biggest threads of the year,then I dont know what is.
__________________
Non Sufficit Orbis-The world is not enough.
Reply With Quote
  #634  
Old 10-24-2014, 09:56 PM
paperengineer's Avatar
paperengineer paperengineer is offline
Member
 
Join Date: Sep 2014
Location: Asheville, North Carolina
Posts: 2,012
Total Downloaded: 1.06 GB
This wasn't already the exciting part? What's next must be unbelievable!
__________________
PAPERENGINEER
Designs in progress:

-C-2A Greyhound
-Br.1050 Alize
Reply With Quote
  #635  
Old 10-24-2014, 10:48 PM
Getter 1 Getter 1 is offline
Member
 
Join Date: Feb 2008
Location: Spokane, WA
Posts: 1,252
Total Downloaded: 1.67 MB
Still mind boggling here :D

Some raise the bar on building.
You good sir have sent the bar into orbit!
Keep it up.
Loving every post

G1
Reply With Quote
  #636  
Old 10-25-2014, 01:41 AM
Rocky's Avatar
Rocky Rocky is offline
Member
 
Join Date: Oct 2010
Location: Tennessee
Posts: 103
Total Downloaded: 0
Your attetion and precision is beyond compair in ANY medium that I know of !

I think that may include brain surgery! (if I had to have it, I hope it's someone like you.)

Humbly Rocky
Reply With Quote
  #637  
Old 10-25-2014, 07:35 AM
paperengineer's Avatar
paperengineer paperengineer is offline
Member
 
Join Date: Sep 2014
Location: Asheville, North Carolina
Posts: 2,012
Total Downloaded: 1.06 GB
Me too! I love how you're like "I forgot this HUGE detail" when no one notices it but you! It's the most perfect model I think can be made
__________________
PAPERENGINEER
Designs in progress:

-C-2A Greyhound
-Br.1050 Alize
Reply With Quote
  #638  
Old 10-30-2014, 10:26 AM
spacerunner's Avatar
spacerunner spacerunner is offline
Member
 
Join Date: Apr 2012
Location: Filderstadt, Germany
Posts: 2,197
Total Downloaded: 5.57 MB
Thanks eagleclaw, PE, G1 and Rocky for your continued interest and your very nice compliments that make me happy.

Hello guys,

after the painters came from the rapport, it was now finally progressing again.

As suspected, the guys had indeed stirred the color after the long break, but not sufficiently diluted. If I would have the guys let continue to spray, I could have saved myself the effort with the 0.5 mm ROFI tubes and could probably take some rods.

So it was good that I've remembered the advice of a friend in our German Raumcon forum. After that I did not follow the the specifications of manufacturer Revell, after one should mix the Aqua Color paint with the thinner Aqua color mix 4:1, but I followed his suggestion and have selected a mixture ratio of paint to thinner by about 1:3.

And so two passes were then made​​, which here are the parts after the first passage,



and also the ROFI tubes look great.



The second pass is now also done, now everything should still really dry, then the fitters can finally begin with the supply lines.

__________________
Greetings from Germany
Manfred
Under construction:
Launch Pad 39A with Challenger STS-6 (1:144)

Last edited by spacerunner; 09-28-2016 at 04:35 AM.
Reply With Quote
  #639  
Old 10-30-2014, 11:50 AM
spacerunner's Avatar
spacerunner spacerunner is offline
Member
 
Join Date: Apr 2012
Location: Filderstadt, Germany
Posts: 2,197
Total Downloaded: 5.57 MB
Hello Guys,

on the fitters is also no relying, they were reassigned to another site.

Therefore I've also just taken a couple of days to relax and was over the weekend at the Spays Days in Darmstadt, supposedly Germany's largest Model Exhibition for Science Fiction, Fantasy and Space on 600 sqm with over 50 exhibitors and hundreds of exhibits and speakers from all over Europe.
Although it mostly went to SciFi, were also represented a few Real Space models, so among other things, a very impressive paper model of the ISS (1:80) of my friend Michael from Jülich.





But I will not digress too far, because I've also continued.

First, I've fiddled about some small handles for TSMs from 0.4 mm copper wire.





As can be individually handled quite difficult on the small base plates, it is especially favorable for the painting, if you have several glued at a stretch and painted,





which can then be subsequently separated.

Then I started installing the ROFI supply lines what I'm shirked me for long enough. First I made a test fit of the double-ROFI on the back of LOX-TSM,



and then finally glued.





So far so good, the difficulty in mounting the supply lines now is that you must carefully thread before gluing under the ladder through in order not to bend. Simultaneously with the adhesive would be a futile exercise. Even the positioning of the base plate before gluing was not so easy when you do not know exactly where it should sit. That means to try first time with applied supply line and mark slightly, then push the supply line aside and glue the plate.



Then I have the supply line as much as possible aligned to the right in the ROFI bracket and left on the base plate and first carefully glued under the ladder on the box and then at the connection points. The details I save my dear ...



And an additional support from U-profile had to be installed even under the supply line.



Well, all beginnings are difficult, maybe I need to correct something here and there.

__________________
Greetings from Germany
Manfred
Under construction:
Launch Pad 39A with Challenger STS-6 (1:144)

Last edited by spacerunner; 09-28-2016 at 04:39 AM.
Reply With Quote
  #640  
Old 10-30-2014, 04:37 PM
Chris Knowlton's Avatar
Chris Knowlton Chris Knowlton is offline
Member
 
Join Date: Jan 2011
Location: Pinehurst, North Carolina
Posts: 203
Total Downloaded: 0
I think it is fantastic!

Chris
Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -6. The time now is 09:02 AM.


Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.

Parts of this site powered by vBulletin Mods & Addons from DragonByte Technologies Ltd. (Details)
Copyright © 2007-2023, PaperModelers.com