PaperModelers.com

Go Back   PaperModelers.com > Card Models > Model Builds > Railway related builds

Reply
 
Thread Tools Display Modes
  #61  
Old 04-07-2016, 01:02 PM
Styrian Spitfire's Avatar
Styrian Spitfire Styrian Spitfire is offline
Member
 
Join Date: Feb 2014
Location: Styria
Posts: 2,129
Total Downloaded: 0
Hello ,

The roof is now covered. The bell and the two steam dome levers are grown. When boiler handrail is tricky now. First, the wire should be accurate before bent .The are retaining rings stuck loosely to the wire, and then glue them to the uprights.

Part 117 - the filigrees supports for the oversized headlights, as well as the parts to it.

Kind regards
Kurt
Attached Thumbnails
-dscf0010.jpg   -dscf0011.jpg   -dscf0058.jpg   -dscf0059.jpg   -dscf0060.jpg  

-dscf0061.jpg  
Reply With Quote
  #62  
Old 04-08-2016, 02:53 AM
sharunas's Avatar
sharunas sharunas is offline
Member
 
Join Date: May 2014
Location: Lithuania
Posts: 648
Total Downloaded: 14.71 MB
Everything look really nice!
__________________
Finished projects: RMS Mauretania 1/250; SS Canberra 1/250; Toyota Hilux Overdrive;
Current projects: SS Michelangelo 1/250
Reply With Quote
  #63  
Old 04-08-2016, 09:26 AM
elliott elliott is offline
Eternal Member
 
Join Date: Oct 2007
Posts: 8,416
Total Downloaded: 6.51 GB
Your work is impeccable Kurt. Looking very good.
__________________
This is a great hobby for the retiree - interesting, time-consuming, rewarding - and about as inexpensive a hobby as you can find.
Shamelessly stolen from a post by rockpaperscissor
Reply With Quote
  #64  
Old 04-09-2016, 12:10 AM
Styrian Spitfire's Avatar
Styrian Spitfire Styrian Spitfire is offline
Member
 
Join Date: Feb 2014
Location: Styria
Posts: 2,129
Total Downloaded: 0
Hello ,

thanks to all

achieved first interim target ...........

The finished lamp with unfortunately foggy glass, probably true foggy Tonight
Thus, the locomotive is after 68 construction days in which I have built 120 hours to both finish.
The tender still follows.

Sincerely
Kurt
Attached Thumbnails
-dscf0002.jpg   -dscf0003.jpg   -dscf0004.jpg   -dscf0005.jpg   -dscf0006.jpg  

-dscf0007.jpg   -dscf0008.jpg   -dscf0010.jpg   -dscf0011.jpg  
Reply With Quote
  #65  
Old 04-09-2016, 02:48 AM
Marcin Jakubiec's Avatar
Marcin Jakubiec Marcin Jakubiec is offline
Member
 
Join Date: Nov 2015
Location: Rychvald, Czech Republic
Posts: 329
Total Downloaded: 69.70 MB
:)

Model looks really nice and pretty I admire your building speed
__________________
Greetings from Czech Republic
---------------------------
Proud owner of: http://kartonowakolej.pl
Proud member of: Bielska Strefa Modelarska
Reply With Quote
Google Adsense
  #66  
Old 04-09-2016, 11:26 AM
sharunas's Avatar
sharunas sharunas is offline
Member
 
Join Date: May 2014
Location: Lithuania
Posts: 648
Total Downloaded: 14.71 MB
Congratulations on finishing locomotive! Looks great.
Hope after finishing tender it will be standing on a fragment of a rails?
__________________
Finished projects: RMS Mauretania 1/250; SS Canberra 1/250; Toyota Hilux Overdrive;
Current projects: SS Michelangelo 1/250
Reply With Quote
  #67  
Old 04-10-2016, 07:14 PM
Art Deco's Avatar
Art Deco Art Deco is offline
Member
 
Join Date: Dec 2008
Location: Spokane, WA
Posts: 1,382
Total Downloaded: 0
Beautiful work, especially on the cutting and assembling of the many details!
Reply With Quote
  #68  
Old 04-11-2016, 06:35 AM
Tom Lapinski Tom Lapinski is offline
Member
 
Join Date: Jul 2007
Location: Bayonne, NJ
Posts: 1,004
Total Downloaded: 3.47 GB
Excellent build!
Reply With Quote
  #69  
Old 04-27-2016, 12:39 PM
Styrian Spitfire's Avatar
Styrian Spitfire Styrian Spitfire is offline
Member
 
Join Date: Feb 2014
Location: Styria
Posts: 2,129
Total Downloaded: 0
Hi friends ,

great thanks to all ,

After my cycling holiday in Mallorca, here are some Pictures FERNITZER GENUSSRADLER: Mallorca 2016 Tour 1 it moves on again. After the train is finished, I'm starting all over again, with the tender.


some parts have to be prepared for the eight wheels of the tender. Step by step ..........
... Arise so .and the eight wheels, the axes of 0.8 mm floral wire

LG Kurt
Attached Thumbnails
-dscf0001.jpg   -dscf0001-1-.jpg   -dscf0001-2-.jpg   -dscf0002.jpg  
Reply With Quote
  #70  
Old 05-06-2016, 12:37 AM
Styrian Spitfire's Avatar
Styrian Spitfire Styrian Spitfire is offline
Member
 
Join Date: Feb 2014
Location: Styria
Posts: 2,129
Total Downloaded: 0
Hello !

Register me again with little progress .............

The two supports for the bogies, and the corresponding frame parts.

When mounting the axles should pay close attention to the sequence of building steps, because otherwise the axis can no longer suffer.
Thus are the two bogies.

Kind regards
Kurt
Attached Thumbnails
-dscf0027.jpg   -dscf0028.jpg   -dscf0029.jpg   -dscf0030.jpg  
Reply With Quote
Google Adsense
Reply

Tags
locomotive, bow, sheets, modelik, jupiter, central, drawings, pacific, wait, parts, distribute, good, piece, condition, kurt, museum, usual, fresh, factory, build, printing, year, manageable, usa, complex


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -6. The time now is 02:38 PM.


Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.

Parts of this site powered by vBulletin Mods & Addons from DragonByte Technologies Ltd. (Details)
Copyright © 2007-2023, PaperModelers.com