#61
|
||||
|
||||
Hello ,
The roof is now covered. The bell and the two steam dome levers are grown. When boiler handrail is tricky now. First, the wire should be accurate before bent .The are retaining rings stuck loosely to the wire, and then glue them to the uprights. Part 117 - the filigrees supports for the oversized headlights, as well as the parts to it. Kind regards Kurt |
#62
|
||||
|
||||
Everything look really nice!
__________________
Finished projects: RMS Mauretania 1/250; SS Canberra 1/250; Toyota Hilux Overdrive; Current projects: SS Michelangelo 1/250 |
#63
|
|||
|
|||
Your work is impeccable Kurt. Looking very good.
__________________
This is a great hobby for the retiree - interesting, time-consuming, rewarding - and about as inexpensive a hobby as you can find. Shamelessly stolen from a post by rockpaperscissor |
#64
|
||||
|
||||
Hello ,
thanks to all achieved first interim target ........... The finished lamp with unfortunately foggy glass, probably true foggy Tonight Thus, the locomotive is after 68 construction days in which I have built 120 hours to both finish. The tender still follows. Sincerely Kurt |
#65
|
||||
|
||||
:)
Model looks really nice and pretty I admire your building speed
__________________
Greetings from Czech Republic --------------------------- Proud owner of: http://kartonowakolej.pl Proud member of: Bielska Strefa Modelarska |
Google Adsense |
#66
|
||||
|
||||
Congratulations on finishing locomotive! Looks great.
Hope after finishing tender it will be standing on a fragment of a rails?
__________________
Finished projects: RMS Mauretania 1/250; SS Canberra 1/250; Toyota Hilux Overdrive; Current projects: SS Michelangelo 1/250 |
#67
|
||||
|
||||
Beautiful work, especially on the cutting and assembling of the many details!
|
#68
|
|||
|
|||
Excellent build!
|
#69
|
||||
|
||||
Hi friends ,
great thanks to all , After my cycling holiday in Mallorca, here are some Pictures FERNITZER GENUSSRADLER: Mallorca 2016 Tour 1 it moves on again. After the train is finished, I'm starting all over again, with the tender. some parts have to be prepared for the eight wheels of the tender. Step by step .......... ... Arise so .and the eight wheels, the axes of 0.8 mm floral wire LG Kurt |
#70
|
||||
|
||||
Hello !
Register me again with little progress ............. The two supports for the bogies, and the corresponding frame parts. When mounting the axles should pay close attention to the sequence of building steps, because otherwise the axis can no longer suffer. Thus are the two bogies. Kind regards Kurt |
Google Adsense |
Tags |
locomotive, bow, sheets, modelik, jupiter, central, drawings, pacific, wait, parts, distribute, good, piece, condition, kurt, museum, usual, fresh, factory, build, printing, year, manageable, usa, complex |
|
|