#11
|
||||
|
||||
The bow features two large anchor windlasses and many smaller details.
The ship is now ready to receive the superstructure, which will be assembled separately.
__________________
Currently building: - HMV EGV Berlin 1:250 |
#12
|
||||
|
||||
It's now time to build the main superstructure: the framework (1-6) and the decks (7-12).
__________________
Currently building: - HMV EGV Berlin 1:250 |
#13
|
||||
|
||||
The bridge with its complex interior is built and placed on top of the superstructure assembly.
__________________
Currently building: - HMV EGV Berlin 1:250 |
#14
|
||||
|
||||
The roof of the bridge forms the observation deck with two funnels.
__________________
Currently building: - HMV EGV Berlin 1:250 |
#15
|
||||
|
||||
The funnels are topped by another deck, which features the radar, firefighting and observation equipment and an elaborate lattice mast with antennas and weather station.
The navigation lights (11-12) complete the superstructure assembly.
__________________
Currently building: - HMV EGV Berlin 1:250 |
Google Adsense |
#16
|
||||
|
||||
The superstructure is added to the hull on the main deck (1-5).
A large winch is built and glued in place (6-11).
__________________
Currently building: - HMV EGV Berlin 1:250 |
#17
|
||||
|
||||
Behind the superstructures two additional levels and the connecting staircases are built (1-7).
__________________
Currently building: - HMV EGV Berlin 1:250 |
#18
|
||||
|
||||
The lifeboat on the starboard side requires a platform and a davit.
__________________
Currently building: - HMV EGV Berlin 1:250 |
#19
|
||||
|
||||
We are almost at the end: now comes the 6,5 t hydraulic crane...
__________________
Currently building: - HMV EGV Berlin 1:250 |
#20
|
||||
|
||||
... and the two lifeboats.
__________________
Currently building: - HMV EGV Berlin 1:250 |
Google Adsense |
|
|