PaperModelers.com

Go Back   PaperModelers.com > Card Models > Model Builds > Ships and watercraft

Reply
 
Thread Tools Display Modes
  #11  
Old 12-02-2013, 07:30 AM
Tommaso's Avatar
Tommaso Tommaso is offline
Member
 
Join Date: Jul 2011
Location: Giessen, Germany
Posts: 249
Total Downloaded: 0
Hello Corbin,
your report is very interesting and your model is of excellent quality. I really hope you'll resume the construction, at this point it's certainly worth the effort!!

Cheers,
Tommaso
__________________
Currently building:
- HMV EGV Berlin 1:250
Reply With Quote
  #12  
Old 12-02-2013, 05:49 PM
Beachead's Avatar
Beachead Beachead is offline
Member
 
Join Date: Mar 2010
Location: Delaware
Posts: 648
Total Downloaded: 0
Holly big ships, Batman. That's a huge! Good on you for building it! Look forward to seeing your progress.

You done yet? LOL
__________________
Greg
Reply With Quote
  #13  
Old 12-10-2013, 10:41 AM
Tommaso's Avatar
Tommaso Tommaso is offline
Member
 
Join Date: Jul 2011
Location: Giessen, Germany
Posts: 249
Total Downloaded: 0
Hello!

Let's go!!

The first stage of the construction is the hull. Three longitudinal and 21 transversal bulkheads are assembled on a large base plate. Six additional longitudinal frames will have to be mounted (figures 1-2).
The asymmetric bulkhead near the center will house the side interior assembly (Einbausatz EB1, figure 3).
The last frames and the EB1 are integrated in the framework (figures 4-5).
Some details of the bow (figure 6) and of the stern (figure 7).
A small lateral doors allows for a look inside the EB1 (figures 8-11).

Cheers,
Tommaso
Attached Thumbnails
HMV Einsatzgruppenversorger EGV Berlin 1:250-a1-01.jpg   HMV Einsatzgruppenversorger EGV Berlin 1:250-a1-02.jpg   HMV Einsatzgruppenversorger EGV Berlin 1:250-a1-03.jpg   HMV Einsatzgruppenversorger EGV Berlin 1:250-a1-04.jpg   HMV Einsatzgruppenversorger EGV Berlin 1:250-a1-05.jpg  

HMV Einsatzgruppenversorger EGV Berlin 1:250-a1-06.jpg   HMV Einsatzgruppenversorger EGV Berlin 1:250-a1-07.jpg   HMV Einsatzgruppenversorger EGV Berlin 1:250-a1-08.jpg   HMV Einsatzgruppenversorger EGV Berlin 1:250-a1-09.jpg   HMV Einsatzgruppenversorger EGV Berlin 1:250-a1-10.jpg  

HMV Einsatzgruppenversorger EGV Berlin 1:250-a1-11.jpg  
__________________
Currently building:
- HMV EGV Berlin 1:250
Reply With Quote
  #14  
Old 12-10-2013, 11:54 PM
Chaldane's Avatar
Chaldane Chaldane is offline
Member
 
Join Date: Feb 2009
Location: Anchorage, Alaska
Posts: 207
Total Downloaded: 0
Good start! I'm looking forward to watching it take shape.

Cheers, Corbin
Reply With Quote
  #15  
Old 12-17-2013, 03:34 PM
Tommaso's Avatar
Tommaso Tommaso is offline
Member
 
Join Date: Jul 2011
Location: Giessen, Germany
Posts: 249
Total Downloaded: 0
Hello!
Let's go on with the next step of the hull.

The inner deck, which spans for two thirds of the hull, from the stern to the bulkhead 15, is cut and glued on the frame (Figs. 1-2).
The bulkhead 5 features already a small part of the inner wall (fig. 3); the remaining parts are built at this stage.
They consist of an after (fig. 4) and a forward part (fig. 5), on which several small pieces like doors and life vests are glued. Fig. 6: I replaced the printed glass in the tridimensional porthole with transparent foil. Fig. 7: the final result; all in all, the two walls consist of 128 parts!

Cheers,
Tommaso
Attached Thumbnails
HMV Einsatzgruppenversorger EGV Berlin 1:250-a2-01.jpg   HMV Einsatzgruppenversorger EGV Berlin 1:250-a2-02.jpg   HMV Einsatzgruppenversorger EGV Berlin 1:250-a2-03.jpg   HMV Einsatzgruppenversorger EGV Berlin 1:250-a2-04.jpg   HMV Einsatzgruppenversorger EGV Berlin 1:250-a2-05.jpg  

HMV Einsatzgruppenversorger EGV Berlin 1:250-a2-06.jpg   HMV Einsatzgruppenversorger EGV Berlin 1:250-a2-07.jpg  
__________________
Currently building:
- HMV EGV Berlin 1:250
Reply With Quote
Google Adsense
  #16  
Old 12-19-2013, 03:54 PM
Tommaso's Avatar
Tommaso Tommaso is offline
Member
 
Join Date: Jul 2011
Location: Giessen, Germany
Posts: 249
Total Downloaded: 0
Hello!
Here is a small update in the construction.

Some wall cabinets are built (figs. 1-2) and added to the inner walls (fig. 3).
The walls are now glued in their position on the deck.

Cheers,
Tommaso
Attached Thumbnails
HMV Einsatzgruppenversorger EGV Berlin 1:250-a2-08.jpg   HMV Einsatzgruppenversorger EGV Berlin 1:250-a2-09.jpg   HMV Einsatzgruppenversorger EGV Berlin 1:250-a2-10.jpg   HMV Einsatzgruppenversorger EGV Berlin 1:250-a3-1.jpg   HMV Einsatzgruppenversorger EGV Berlin 1:250-a3-2.jpg  

HMV Einsatzgruppenversorger EGV Berlin 1:250-a3-3.jpg   HMV Einsatzgruppenversorger EGV Berlin 1:250-a3-4.jpg   HMV Einsatzgruppenversorger EGV Berlin 1:250-a3-5.jpg   HMV Einsatzgruppenversorger EGV Berlin 1:250-a3-6.jpg   HMV Einsatzgruppenversorger EGV Berlin 1:250-a3-7.jpg  

__________________
Currently building:
- HMV EGV Berlin 1:250
Reply With Quote
  #17  
Old 12-19-2013, 08:03 PM
Papercut's Avatar
Papercut Papercut is offline
Member
 
Join Date: Dec 2008
Location: North Carolina
Posts: 2,019
Total Downloaded: 0
Nice, very nice.......look forward to more of your build.
Rick
__________________
Kartonist in the making........
Reply With Quote
  #18  
Old 12-25-2013, 04:12 PM
Tommaso's Avatar
Tommaso Tommaso is offline
Member
 
Join Date: Jul 2011
Location: Giessen, Germany
Posts: 249
Total Downloaded: 0
Hello,
here there are a few pictures to conclude the year.

The wall cabinets are glued to the walls (fig. 1-2).
It's now time to move on to the outer walls. The parts are mostly located on sheets 12 and 13 and require an extensive cutting work on the many openings, before being cut out (fig. 3 - 4). The parts of the transom are also prepared (fig. 5).

And now it's holiday time!
Merry Christmas, happy new year and see you in January!
Attached Thumbnails
HMV Einsatzgruppenversorger EGV Berlin 1:250-a3-8.jpg   HMV Einsatzgruppenversorger EGV Berlin 1:250-a3-9.jpg   HMV Einsatzgruppenversorger EGV Berlin 1:250-a4-1.jpg   HMV Einsatzgruppenversorger EGV Berlin 1:250-a4-2.jpg   HMV Einsatzgruppenversorger EGV Berlin 1:250-a4-3.jpg  

__________________
Currently building:
- HMV EGV Berlin 1:250
Reply With Quote
  #19  
Old 01-06-2014, 05:30 PM
Beachead's Avatar
Beachead Beachead is offline
Member
 
Join Date: Mar 2010
Location: Delaware
Posts: 648
Total Downloaded: 0
Whew...I'm tired from just looking at the pics and reading your updates. That is a LOT of parts. Looking great.
__________________
Greg
Reply With Quote
  #20  
Old 01-07-2014, 12:58 AM
Longbow's Avatar
Longbow Longbow is offline
Member
 
Join Date: Jan 2008
Location: Huizen, Holland
Posts: 498
Total Downloaded: 46.13 MB
That is some very precise cutting and building Tommaso ! Great job !
Reply With Quote
Google Adsense
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -6. The time now is 09:35 AM.


Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.

Parts of this site powered by vBulletin Mods & Addons from DragonByte Technologies Ltd. (Details)
Copyright © 2007-2023, PaperModelers.com