#61
|
||||
|
||||
Such delicate parts.
__________________
"It's all in the reflexes." |
#62
|
||||
|
||||
This is excellent Kurt.
Delicate towers like this always get my attention. Greetings, Mike |
#63
|
||||
|
||||
Hello to gotham and Mike, thanks !
The round parts I cut with a scalpel. The whole is then covered with the grid. With the assembly device, which is not glued, I fix the intermediate floor . Kind regards Kurt |
#64
|
|||
|
|||
Really nice, fine detail. Reminds me of lacework. You're doing an excellent job. Keep at it.
__________________
This is a great hobby for the retiree - interesting, time-consuming, rewarding - and about as inexpensive a hobby as you can find. Shamelessly stolen from a post by rockpaperscissor |
#65
|
||||
|
||||
good work on the crane.
__________________
David........... Paper modelling gives you a happy high. currently building. c GAZ 51 ALG 17, wagon 111a. unex DH411 excavator and spitfire Mk 9 |
Google Adsense |
#66
|
||||
|
||||
Hello friends !
The steps for the stair part 10 I glue directly onto the board. After thorough drying, the staircase is assembled and inserted into the tower. Winch, railing and ladder complete this phase of construction. Best regards Kurt |
#67
|
||||
|
||||
Hello Kurt,
That ladder is a long one. Nice work. Its an impressive tower. Mike |
#68
|
||||
|
||||
Thank you Mike ,
The small platform 14 set on the tip, and complete with railings and re-stock. The LC parts are glued together for the 40th stage of construction. With part 15 I get the platform for the crane's cab, which is glued to the frame. The whole then between the uprights 16th . Kind regards Kurt |
#69
|
||||
|
||||
This is watchmaker delicate work - such precision, and a steady hand.
__________________
"It's all in the reflexes." |
#70
|
||||
|
||||
Hi Kurt,
Mighty fine and delicate work going on. I look forward to your future installments.
__________________
Jay Massey treadhead1952 Las Vegas, NV |
Google Adsense |
|
|