PaperModelers.com

Go Back   PaperModelers.com > Card Models > Model Builds > Ships and watercraft

Reply
 
Thread Tools Display Modes
  #1  
Old 11-30-2016, 03:07 PM
herky's Avatar
herky herky is offline
Member
 
Join Date: Mar 2011
Location: feilding ,new zealand
Posts: 6,997
Total Downloaded: 857.34 MB
xmas projects

After my partner fell into my workroom she pointed out all my part projects.She informs me i need to finish these over the xmas break before i buy anymore.Anyways a few photos of what will be keeping me busy these holidays
Attached Thumbnails
xmas projects-001.jpg   xmas projects-002.jpg   xmas projects-004.jpg   xmas projects-005.jpg   xmas projects-006.jpg  

xmas projects-007.jpg  
__________________
Carborundum Illegitimi Ne
Herky
Reply With Quote
Google Adsense
  #2  
Old 11-30-2016, 03:11 PM
herky's Avatar
herky herky is offline
Member
 
Join Date: Mar 2011
Location: feilding ,new zealand
Posts: 6,997
Total Downloaded: 857.34 MB
p1 kirishima -which i have given up waiting on parts for and hmv hamburg
p2 asssorted but includes jsc hms sheffield and air daves raf herc
p3 hmv hamburg,whm pacific dream and sharanus ss canberra
p4 jsc atlantic conveyor
p5 whm uss nimitz
p6 canon ''toy train
__________________
Carborundum Illegitimi Ne
Herky
Reply With Quote
  #3  
Old 11-30-2016, 07:50 PM
spaceagent-9 spaceagent-9 is offline
Banned
 
Join Date: Mar 2010
Posts: 4,113
Total Downloaded: 576.80 MB
hahahahah. she told that huh? like you didn't know you have to finish your projects!!
im still looking at printed sheets and partially assembleds a few years later.
well merry Christmas and I hope you get all these done!
Reply With Quote
  #4  
Old 11-30-2016, 08:03 PM
Richschindler Richschindler is offline
Member
 
Join Date: Jun 2014
Location: No longer living in NYC. Mooresville, NC is my home now.
Posts: 2,371
Total Downloaded: 2.51 GB
LOL. Good luck with that.
Reply With Quote
  #5  
Old 11-30-2016, 08:58 PM
wireandpaper's Avatar
wireandpaper wireandpaper is offline
Member
 
Join Date: Feb 2012
Posts: 3,896
Total Downloaded: 2.96 GB
"La Patrona"
Always ask: do you know how many models do you have?
And I always respond: I know which models I don't have, but I would like to have!!!
Happy modeling,
BTW, what is the scale of that C-130.
Reply With Quote
Google Adsense
  #6  
Old 11-30-2016, 09:24 PM
herky's Avatar
herky herky is offline
Member
 
Join Date: Mar 2011
Location: feilding ,new zealand
Posts: 6,997
Total Downloaded: 857.34 MB
Quote:
Originally Posted by wireandpaper View Post
"La Patrona"
Always ask: do you know how many models do you have?
And I always respond: I know which models I don't have, but I would like to have!!!
Happy modeling,
BTW, what is the scale of that C-130.
herk is an air dave at 1;48 scale.have the israeli one and coast guard one hanging from ceiling
__________________
Carborundum Illegitimi Ne
Herky
Reply With Quote
  #7  
Old 11-30-2016, 10:09 PM
missileer missileer is offline
Member
 
Join Date: Jun 2013
Location: Annapolis, MD
Posts: 1,160
Total Downloaded: 985.89 MB
I thought I was the only one with a bunch of unfinished projects.
Reply With Quote
  #8  
Old 11-30-2016, 10:37 PM
herky's Avatar
herky herky is offline
Member
 
Join Date: Mar 2011
Location: feilding ,new zealand
Posts: 6,997
Total Downloaded: 857.34 MB
the problem i have is that i do the big parts first then put off doing the small details.gotta do it other way round when i start next model.
__________________
Carborundum Illegitimi Ne
Herky
Reply With Quote
  #9  
Old 12-01-2016, 09:50 AM
gotham's Avatar
gotham gotham is offline
Member
 
Join Date: May 2015
Location: Elgin, N.E Scotland
Posts: 2,242
Total Downloaded: 2.75 GB
You got caught out !
Simple formula for all modellers out there - Door + lock = quiet life
__________________
"It's all in the reflexes."
Reply With Quote
  #10  
Old 12-01-2016, 11:34 AM
VinceM's Avatar
VinceM VinceM is offline
Member
 
Join Date: Apr 2012
Location: Indiana, USA
Posts: 573
Total Downloaded: 145.94 MB
I've got a partially built spacecraft at work that I was building on my lunch breaks. My job's gotten so busy I've taken to doing emails while eating at my desk and I haven't worked on it for at least a year!
Multitasking with no breaks: one of the perks of management.
__________________
Recent builds: RMS Queen Mary 2, Paris Opera House
In the shipyard: USS Missouri, DKM Graf Zeppelin, RV Calypso.
Future builds: IJN Akagi, SS United States, HMVS Cerberus, and lots more!
Reply With Quote
Google Adsense
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -6. The time now is 10:20 AM.


Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.

Parts of this site powered by vBulletin Mods & Addons from DragonByte Technologies Ltd. (Details)
Copyright © 2007-2023, PaperModelers.com