Tim > Fully compliant.
........................................... ooOoo ....................................
The basket
After finished the lateral panels and floor, it's just plug them.
After, three wires to the structure of the canvas and the boards on sides.
... boards to the front panel
And then on the rear panel.
More 4 wires and is ready to take the canvas. Only 24 pieces are missing, are the hooks to pass the rope canvas that will be applied only after mounting the canvas.