Hi all!
In the first 4 pictures there are the construction of the wooden walls on the deck and of the funnel.
The other pictures show the construction of the trawl winch, which is a remarkable object made of some ~50 parts, with several lasercut parts (those in the corner of the sheet in the picture). The last picture finally shows the winch installed in place.
Tommaso
__________________
Currently building:
- HMV EGV Berlin 1:250
|