View Single Post
 
Old 09-04-2013, 01:05 AM
spacerunner's Avatar
spacerunner spacerunner is offline
Member
 
Join Date: Apr 2012
Location: Filderstadt, Germany
Posts: 2,198
Total Downloaded: 5.57 MB
And here are the two remaining segments of the Transfer line already trial pre-installed.



The connection of the pipe segments had relatively well to do, because the protective casings were ideal joints.





Now the transfer line must be performed only just around the corner, wherefore made this connection element with segmented elbow pipe.



And now this part must fit only into the gap.



And it fits, and the fitting looks in any case already quite passable.





So, that would be once completed.

Now I'll go back to the Side 2, as yet the LOX-Transfer line is missing, which is produced according to the same pattern.

__________________
Greetings from Germany
Manfred
Under construction:
Launch Pad 39A with Challenger STS-6 (1:144)

Last edited by spacerunner; 10-13-2016 at 10:31 AM.
Reply With Quote