View Single Post
 
Old 12-30-2015, 09:26 AM
bgt01's Avatar
bgt01 bgt01 is offline
Member
 
Join Date: Jan 2012
Location: Zanesville, Ohio
Posts: 556
Total Downloaded: 71.45 MB
WALL ASSEMBLY

The walls are designed as three sections with tabs that lock into slots on the bottom. I cut those off because I was gluing them in place. Also, since I’d already had the trouble with the floor not coming together right I figured I’d have the same problem with the walls. Plus, those big sections were hard to handle. To avoid that, I cut each wall section apart and glued each wall individually to the bottom of the base. For the elevator walls, I used a craft stick to hold the wall base in place while the glue set. The area was too narrow to get my fingers in. (I’m only using one hand in the pic because I’m holding the camera) I let these dry overnight to make sure they were secure before I had to bend the walls in for final assembly.
Attached Thumbnails
Star Trek: TMP Punch-Out Bridge Book-049.jpg   Star Trek: TMP Punch-Out Bridge Book-050.jpg   Star Trek: TMP Punch-Out Bridge Book-052.jpg   Star Trek: TMP Punch-Out Bridge Book-053.jpg   Star Trek: TMP Punch-Out Bridge Book-054.jpg  

Reply With Quote