View Single Post
 
Old 05-29-2016, 02:37 PM
hyair hyair is offline
Member
 
Join Date: Jan 2012
Location: Rehovot - Israel
Posts: 1,703
Total Downloaded: 52.76 MB
Mig -21 bis build diary continued

The main wheels bays were covered. Two cooling vents were added near the Vertical tail. The center line pilon that hold the lower external fuel tank was glued to place.
Next are the two front pitot pipes - the small and the long protruding front one.

Yair
Attached Thumbnails
Mig -21 bis 1:48-20160529_224116.jpg   Mig -21 bis 1:48-20160529_224157.jpg   Mig -21 bis 1:48-20160529_224227.jpg   Mig -21 bis 1:48-20160529_224629.jpg   Mig -21 bis 1:48-20160529_225226.jpg  

Mig -21 bis 1:48-20160529_231144.jpg   Mig -21 bis 1:48-20160529_231339.jpg   Mig -21 bis 1:48-20160529_231551.jpg   Mig -21 bis 1:48-20160529_231612.jpg  
Reply With Quote