View Single Post
 
Old 02-23-2018, 07:34 PM
Wichita Wichita is offline
Member
 
Join Date: Sep 2012
Posts: 132
Total Downloaded: 45.77 MB
Tonino: Excellent suggestion on cutting away some of the gray areas on the octogonal guard pipe and leg struts and junctions. I removed the guard pipe (part 264), removed the blacked out areas, and reattached. It looks much better. Since the piping connected to the 4 large fuel tanks (part 269) would be a dit difficult to remove and will be covered later in the build, I felt it would be best to leave in place. For the leg struts and junctions, I trimmed away the gray areas. Will see how much reinforcement may be needed later in the build. May use superglue to plasticize, but want to make sure their positioning it finalized before doing so.

Thanks for passing along the great ideas! Keep them coming.
Attached Thumbnails
Apollo 13 LM-7 Aquarius-20180224_001854093_ios-min.jpg   Apollo 13 LM-7 Aquarius-20180224_001857259_ios-min.jpg   Apollo 13 LM-7 Aquarius-20180224_012538664_ios-min.jpg   Apollo 13 LM-7 Aquarius-20180224_010508995_ios-min.jpg   Apollo 13 LM-7 Aquarius-20180224_010529716_ios-min.jpg  

Apollo 13 LM-7 Aquarius-20180224_010548105_ios-min.jpg  
Reply With Quote