Funnel assembly.
I admit I could not make the complex (really complex) paper rolls needed for these funnels so I fell back to framing them and filling with balsa and drywall spackle. I do like the results. The louver openings are 100% scratch built. Also have been installing the hanger side vent bulges and the 12.7 cm gun tubs and platforms.
|