View Single Post
 
Old 11-13-2018, 10:10 PM
jimbean's Avatar
jimbean jimbean is offline
Member
 
Join Date: Jul 2007
Location: Northport New York USA
Posts: 435
Total Downloaded: 0
Well the rest of the foremast yards are finally done. I wanted to finish them before
mounting the foremast so that they could just be hung later. The sheets on the top yard
and topgallant yard are strange in that a chain goes through the sheave at the tip of the
yard and then rope is used to go down to the deck. Its on the plans.
The footropes are wire and the suspenders are thread.


The first 2 pics are the top yard, the second 2 are the topgallant yard and the third 2 are
the royal yard. Finally the yards sort of hung on and look sloppy without the braces
and last showing the chain halyards on the movable yards.
cheers Jim
Attached Thumbnails
Museum ship Joseph Conrad 1:96 scratch build-dscf1706.jpg   Museum ship Joseph Conrad 1:96 scratch build-dscf1707.jpg   Museum ship Joseph Conrad 1:96 scratch build-dscf1708.jpg   Museum ship Joseph Conrad 1:96 scratch build-dscf1709.jpg   Museum ship Joseph Conrad 1:96 scratch build-dscf1710.jpg  

Museum ship Joseph Conrad 1:96 scratch build-dscf1711.jpg   Museum ship Joseph Conrad 1:96 scratch build-dscf1713.jpg   Museum ship Joseph Conrad 1:96 scratch build-dscf1714.jpg  
Reply With Quote