View Single Post
 
Old 04-06-2019, 07:34 AM
Michael Mash's Avatar
Michael Mash Michael Mash is offline
POTM Moderator
 
Join Date: Oct 2008
Location: The Great Lakes
Posts: 5,495
Total Downloaded: 18.36 MB
06 – Hull Plating Phase III

Thanks Rgmarine and hello craftsworkers,

The lower hull now has its final finish with coats of flat red paint. The propellers and drive shafts have been installed.

The Seven-inch gun casemate decks are next. Connecticut get six of these guns on each side.

I included an historical photo from “Navsource” to show the actual drive shaft installation. It’s a great view of all the stern detail.

Regards,
Mike
Attached Thumbnails
U.S.S. Connecticut  - 1/250 Scratch Build-036-completed-hull-stern.jpg   U.S.S. Connecticut  - 1/250 Scratch Build-037-completed-hull-bow.jpg   U.S.S. Connecticut  - 1/250 Scratch Build-038-propellers-rudder.jpg   U.S.S. Connecticut  - 1/250 Scratch Build-039-grip-block-removed.jpg   U.S.S. Connecticut  - 1/250 Scratch Build-040-propellers-rudder-installed.jpg  

U.S.S. Connecticut  - 1/250 Scratch Build-041-casemate-decks.jpg   U.S.S. Connecticut  - 1/250 Scratch Build-042-casemate-decks.jpg   U.S.S. Connecticut  - 1/250 Scratch Build-043-stern-view-closeup.jpg  
Reply With Quote