View Single Post
 
Old 08-18-2019, 10:40 AM
silverback920 silverback920 is offline
Member
 
Join Date: Jan 2015
Location: Reno, NV, USA
Posts: 49
Total Downloaded: 56.00 MB
A towering achievement

Keeper's workshop is all sorted. Tower, tower windows, widow's walk and lamp chamber on. Just fretwork, railings and the draught sphere left to go, then on to my (least) favorite part ... the instructions.
For the lamp chamber: anyone interested in attempting the 1st order Fresnel? Not a simple shape, even in its simplest form. It would be at least 16 tiny pieces (or, possibly, one very detailed part with 48 folds) in clear film with all of the Fresnel details printed on. The lamp chamber glass would, of course, be clear film, as well.

C.P. Schenfeld - Director of Window Washing and Wick Trimming at Silver Rose Studios
Attached Thumbnails
St Augustine Lighthouse-beta-build-05-19-0818.jpg   St Augustine Lighthouse-beta-build-06-19-0818.jpg   St Augustine Lighthouse-beta-build-07-19-0818.jpg   St Augustine Lighthouse-beta-build-08-19-0818.jpg  
Reply With Quote