View Single Post
 
Old 02-13-2021, 12:52 PM
Boris Boris is offline
Member
 
Join Date: Jun 2014
Location: Kfar Vradim, Galilee
Posts: 249
Total Downloaded: 948.05 MB
Hello all
I finished the pump compartment by adding the pipes, pressure gauges and valves turn handles.
The red tubes were made by tightly rolling regular office paper, glued and colored red with Carrioca felt tip pen.
Nothing too difficult just need to be careful because of small size
Attached Thumbnails
AC-30(130)-65A firetruck by NovaModel build log-20210212_234721_copy_1024x576.jpg   AC-30(130)-65A firetruck by NovaModel build log-20210213_012136_copy_1024x576.jpg   AC-30(130)-65A firetruck by NovaModel build log-20210213_014341_copy_1024x576.jpg   AC-30(130)-65A firetruck by NovaModel build log-20210213_023812_copy_1024x576.jpg   AC-30(130)-65A firetruck by NovaModel build log-20210213_031845_copy_1024x576.jpg  

AC-30(130)-65A firetruck by NovaModel build log-20210213_034808_copy_1024x576.jpg   AC-30(130)-65A firetruck by NovaModel build log-20210213_035436_copy_1024x576.jpg   AC-30(130)-65A firetruck by NovaModel build log-20210213_040036_copy_1024x576.jpg  
Reply With Quote