Hello everybody,
so then again I've cleaned the
Headset glasses, looked at the clock (
12:30 pm), and got started the assembly of the
4th Crawler chain.
12:30 pm: Separation of the
57 Track shoes
12:45 pm: Deburring the Track shoes & pair formation
1:05 pm: Pre-drilling of the
Pin lugs & Pinning of the pairs (deburring of the pins)
1:35 pm: Pinning the chain & deburring of the pins
For the pinning these two
tweezers were used, whereby the pins were inserted with the wide tweezers into the
Pin Lugs, the position of which could be corrected with the pointed tweezers, which were then pushed in all the way to the stop.
At
2:17 pm, after
approx. 1¾ h, the
4th Chain was finally finished.
BTW, my preliminary estimate was
approx. 1,5 h, so I wasn't that bad at all.
Now half of the
8 Chains are done, wherewith only
approx. 7 h of pure construction time lie ahead of me without interruption,
but which I will still manage too.