At this stage, as all the parts had been cut out, I decided to now glue each individual part together.
These parts consist of
Picture 1 The first-floor building of the temple, plus pillar parts.
Picture 2 The floor for the above, plus pillar parts.
Picture 3 The roof parts, plus pillar parts.
Picture 4 This shows the first-floor building before assembly. This is basically identical to the ground floor, except it has 3 windows, instead of a door and 2 windows.
Picture 5 The building pre-scored and ready for assembly.
Pictures 6 and 7 The finished building.
Picture 8 The two buildings compared, alongside their floors.
Next will be the assembly of the pillars and the roof.
__________________
The SD40 is 55 now!
|