View Single Post
 
Old 09-22-2021, 10:27 PM
hjlyuen's Avatar
hjlyuen hjlyuen is offline
Member
 
Join Date: Oct 2013
Posts: 142
Total Downloaded: 254.35 MB
Do as I say, not as I do. Because the parts are added on in layers, the lower most part 45 (the brace plate between the tank supports) should go on first. Next, the aerator-fluidizer part 38 should be attached to the hoppers before the outlet (product) line part 29 gets in the way. The front fenders part 43 helps to align part 29 (hot air intake - product outline line) so part 43 should also be attached before part 29. Likewise parts 42 (the supports for the fenders) helps align part part 49 (supports for the outlet pipe stowage) and part 51 supports for the hot air intake line). Tomorrow, I will work on the lines to the aerators and to the tank. Right now, my eyes are tired and my back is hurting from being hunched over this model so its time to go for walk outdoors, stand up straight and look at the distant trees.
Attached Thumbnails
1/87 scale sand silos and elevator-9-rear-fenders-outlet-pipe-stowage-6066.jpg   1/87 scale sand silos and elevator-10-front-fenders-6057.jpg   1/87 scale sand silos and elevator-11-rear-fenders-outlet-pipe-stowage-6066.jpg   1/87 scale sand silos and elevator-12-hot-air-outlet-pipe-6063.jpg   1/87 scale sand silos and elevator-13-hot-air-pipe-stowage-6065.jpg  

Reply With Quote